Table of Content
- Lecture # 1: Procedure of Estimating + Rules & Methods of Measurement
- Lecture # 2: Method of Building Estimates (Separate or Individual Wall Method)
- Lecture # 3: Method of Building Estimates (Center Line Method)
- Lecture # 4: Estimate of Arch Masonry & Masonry Steps
- Lecture # 5: R.C.C Works & Structures (R.C.C Slab & Beam)
- Lecture # 6: R.C.C Works & Structures (R.C.C Column, Foundation & Retaining Wall)
- Lecture # 7: Analysis of Rate (Material-Concrete, Brickwork, Mortar)
- Lecture # 8: Analysis of Material-(Plastering & Pointing), MRS-2016, Unit of Analysis
- Lecture # 9: Estimating, Types of Estimates, Estimating Scope
- Lecture # 10: Specifications for different classes of buildings & Civil Engineering Works
- Lecture # 11: Roads & Irrigation Estimation
- Lecture # 12: Valuation
- Lecture # 13: Tendering
- Lecture # 14: Preparation of Civil Engineering Contracts (Contract System, Contract Document, etc.)
- Lecture # 15: Evaluation of Proposals & Contracts
- Lecture # 16: BOC, Project Evaluation & Estimation, Contract Documents as per Pakistan Standards
Rate this Page
How useful was this Content?
Click on a hearts to rate it!
Average rating 1 / 5. Vote count: 1
No votes so far! Be the first to rate this content.
We are sorry that this post was not useful for you!
Let us improve this post!
Tell us how we can improve this post?
1
(1)
Pay What You What
To keep ‘My Trust Worth’ sustainable and free, please support this work by contributions to the following Bank Account.
Account Title: Shad Muhammad
Bank: Habib Bank Limited (HBL)
IBAN: PK78HABB0023657000312403
For Pakistan: 23657000312403