Quantity Survey & Estimation
Course Instructor
Engr. Shad Muhammad
Lecturer, Department of Civil Engineering
Qurtuba University of Science & IT, D. I. Khan.
Review of Lecture # 4
Arch Masonry
Estimate of 4 types of Arches Masonry
Masonry Steps
Calculation of Simple Masonry Steps
Content of Lecture # 5
Example #1: Estimate of R.C.C Slab
Example #2: Estimate of R.C.C Beam
R.C.C Work & Structures
Reinforced Cement Concrete work is usually estimated under 2 items.
1.The concrete work including centering & shuttering & binding of steel bars in position is taken under one item in m3 .
2.The steel reinforcement & its bending is taken under a separate item in quintals (cwt) or Kg or tones.
The quantity of steel being small, no deduction is made for steel from the volume of concrete.
Binding wire is not taken separately, but wp-wp-includessd in item of R.C.C work.
R.C.C Work & Structures
.
Bar Bending Equipment and Binding Wires
Problem # 1: Estimate of R.C.C Roof Slab
Prepare a detailed estimate of R.C.C Roof Slab of 3 m clear span and 6 m long from the given drawings. R.C.C. work including centering and shuttering and steel reinforcement in detail shall be taken separately. Clear cover of concrete on all side is 4 cm.
Problem # 1: Estimate of R.C.C Roof Slab
Prepare a detailed estimate of R.C.C Roof Slab of 3 m clear span and 6 m long from the given drawings. R.C.C. work including centering and shuttering and steel reinforcement in detail shall be taken separately. Clear cover of concrete on all side is 4 cm.
Length and Special Considerations
Flow Chart (Procedure)
Problem # 2: Estimate of R.C.C Beam
Prepare a detailed estimate of R.C.C Beam of 8 m clear span and 75 cm * 40 cm in section from the given drawings. Steel in detail and R.C.C work shall be calculated separately. Also prepare schedule of bars. Clear cover is 4 cm from sides.