Quantity Survey & Estimation – Lecture # 5

Quantity Survey & Estimation – Lecture # 5

Table of Content

    • Example #1: Estimate of R.C.C Slab
    • Example #2: Estimate of R.C.C Beam

[su_divider top=”yes” text=”Go to the top” style=”default” divider_color=”#FD8B00″ link_color=”#FD8B00″ size=”4″ margin=”15″]

Quantity Survey & Estimation – Lecture # 5 – PDF

[wonderplugin_pdf src=”https://www.mytrustworth.com/wp-content/uploads/2019/06/Quantity-Survey-_-Estimation-Lecture-5.pdf” width=”100%” height=”550px” style=”border:0;”]

Download Quantity Survey & Estimation (Lecture # 5) PDF

[su_divider top=”yes” text=”Go to the top” style=”default” divider_color=”#FD8B00″ link_color=”#FD8B00″ size=”4″ margin=”15″]

Quantity Survey & Estimation – Lecture # 5 – Excerpt

Quantity Survey & Estimation

Course Instructor

Engr. Shad Muhammad

Lecturer, Department of Civil Engineering

Qurtuba University of Science & IT, D. I. Khan.

Review of Lecture # 4

Arch Masonry

Estimate of 4 types of Arches Masonry

Masonry Steps

Calculation of Simple Masonry Steps

Content of Lecture # 5

Example #1: Estimate of R.C.C Slab

Example #2: Estimate of R.C.C Beam

R.C.C Work & Structures

Reinforced Cement Concrete work is usually estimated under 2 items.

1.The concrete work including centering & shuttering & binding of steel bars in position is taken under one item in m3 .

2.The steel reinforcement & its bending is taken under a separate item in quintals (cwt) or Kg or tones.

The quantity of steel being small, no deduction is made for steel from the volume of concrete.

Binding wire is not taken separately, but wp-wp-includessd in item of R.C.C work.

R.C.C Work & Structures

.

Bar Bending Equipment and Binding Wires

Problem # 1: Estimate of R.C.C Roof Slab

Prepare a detailed estimate of R.C.C Roof Slab of 3 m clear span and 6 m long from the given drawings. R.C.C. work including centering and shuttering and steel reinforcement in detail shall be taken separately. Clear cover of concrete on all side is 4 cm.

Problem # 1: Estimate of R.C.C Roof Slab

Prepare a detailed estimate of R.C.C Roof Slab of 3 m clear span and 6 m long from the given drawings. R.C.C. work including centering and shuttering and steel reinforcement in detail shall be taken separately. Clear cover of concrete on all side is 4 cm.

Length and Special Considerations

Flow Chart (Procedure)

Problem # 2: Estimate of R.C.C Beam

Prepare a detailed estimate of R.C.C Beam of 8 m clear span and 75 cm * 40 cm in section from the given drawings. Steel in detail and R.C.C work shall be calculated separately. Also prepare schedule of bars. Clear cover is 4 cm from sides.